Supply Date12 Jul 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/41
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity45.5
Freight0
Loading Charges0
Offloading Charges0
Royalty3.44876657
Other Cost0.1912087912
Quality Deviance0
Grade Deviance0
Total Cost4210.38
Conversion Rate (Please insert 1 if no conversion is required)23.2857
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.18
Fe4.32
SiO28.16
Al2O38.35
P0.120
Size 0-10MM10.24
Size 10-20MM21.69
Size 20-100MM64.77
Size +100MM3.30
MOISTURE3.68