Supply Date05 Jul 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/33
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity42.58
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-1.31728511038
Quality Deviance0
Grade Deviance0
Total Cost3571.95
Conversion Rate (Please insert 1 if no conversion is required)24.2943
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.38
Fe4.95
SiO210.82
Al2O37.40
P0.123
Size 0-10MM8.34
Size 10-20MM15.26
Size 20-100MM72.88
Size +100MM3.52
MOISTURE2.60