Supply Date03 Jul 2025
Contract NumberSAFAL/P/IRON ORE/05/2025/21
ItemIron Ore
Supplier NameAlex siulemba
Grade (%)N/A
Lot NumberALEX SILUMBA IRON ORE FY 2023
Deviance0
Inward Quantity33.4
Freight0
Loading Charges0
Offloading Charges0
Royalty0.7859716471
Other Cost0
Quality Deviance(not set)
Grade Deviance0
Total Cost1173.03
Conversion Rate (Please insert 1 if no conversion is required)24.1739
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe67.20
Mn0.45
SiO22.24
Al2O34.93
P0.148
Size 0-10MM3.65