Supply Date25 Jun 2025
Contract NumberSAFAL/P/MANGANESE ORE/06/2025/33
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand ZMW 2070
Deviance0
Inward Quantity46.3
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost4.41598272138
Quality Deviance0
Grade Deviance0
Total Cost4293.68
Conversion Rate (Please insert 1 if no conversion is required)23.4375
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.37
Fe4.49
SiO28.04
Al2O38.21
P0.120
Size 0-10MM8.50
Size 10-20MM15.82
Size 20-100MM67.08
Size +100MM8.60
MOISTURE3.65