Supply Date09 Jun 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity39.76
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0.04024144869
Quality Deviance0
Grade Deviance0
Total Cost3182.4
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.47
Fe4.58
SiO213.80
Al2O37.50
P0.127
Size 0-10MM7.78
Size 10-20MM23.10
Size 20-100MM69.12
Size +100MM.
MOISTURE3.85