Supply Date31 Oct 2019
Contract NumberOS/MN ORE/75/2019
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Tuf Mn Ore
Deviance0
Inward Quantity9.73
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost661.71
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn40.5
Fe3.8
SiO210.6
Al2O35.5
P0.17
Size 0-10MM10-100MM
Size 10-20MM-
Size 20-100MM-
Size +100MM-