Supply Date07 Jun 2025
Contract NumberSAFAL/P/IRON ORE/06/2025/26
ItemIron Ore
Supplier NameJIMMY BANDA
Grade (%)N/A
Lot NumberIron Ore- JIMMY BANDA
Deviance0
Inward Quantity20.92
Freight0
Loading Charges0
Offloading Charges0
Royalty0.690444252
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost633.48
Conversion Rate (Please insert 1 if no conversion is required)25.346
Inward StatusAccepted

Raw Material Test

Showing 1-12 of 12 items.
Raw Material ComponentValue
Fe67.12
Mn0.85
SiO24.78
Al2O33.56
P0.130
Size 0-10MM7.63
Fe
Mn
SiO2
Al2O3
P
Size 0-10MM