Supply Date06 Jun 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity39.92
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-3.90000501002
Quality Deviance0
Grade Deviance0
Total Cost3037.91
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.05
Fe7.61
SiO213.98
Al2O36.43
P0.124
Size 0-10MM8.26
Size 10-20MM13.50
Size 20-100MM74.95
Size +100MM3.29
MOISTURE3.68