Supply Date26 Apr 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity60.22
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-5.80006642311
Quality Deviance0
Grade Deviance0
Total Cost4528.54
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.10
Fe2.19
SiO222.82
Al2O31.26
P0.123
Size 0-10MM10.52
Size 10-20MM35.60
Size 20-100MM53.88
Size +100MM.
MOISTURE10.52