Supply Date25 Apr 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity38.8
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-6.86005154639
Quality Deviance0
Grade Deviance0
Total Cost2876.63
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn36.57
Fe2.10
SiO223.08
Al2O31.75
P0.119
Size 0-10MM10.12
Size 10-20MM45.10
Size 20-100MM44.78
Size +100MM.
MOISTURE4.52