Supply Date24 Apr 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity50.44
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-3.29996034892
Quality Deviance0
Grade Deviance0
Total Cost3919.19
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.35
Fe1.86
SiO221.97
Al2O31.68
P0.117
Size 0-10MM8.56
Size 10-20MM52.30
Size 20-100MM39.14
Size +100MM.
MOISTURE3.36