Supply Date24 Apr 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity51.32
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-5.59996102883
Quality Deviance0
Grade Deviance0
Total Cost3869.53
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.20
Fe2.50
SiO223.47
Al2O32.24
P0.120
Size 0-10MM9.28
Size 10-20MM47.66
Size 20-100MM43.06
Size +100MM.
MOISTURE3.24