Supply Date17 Apr 2025
Contract NumberSAFAL/P/MANGANESE ORE/04/2025/7
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity33.14
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost-3.75849124925
Quality Deviance0
Grade Deviance0
Total Cost2559.78
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.12
Fe11.35
SiO210.67
Al2O37.83
P0.123
Size 0-10MM6.27
Size 10-20MM13.77
Size 20-100MM69.67
Size +100MM10.29
MOISTURE3.18