Supply Date29 Nov 2024
Contract NumberSAFAL/P/MANGANESE ORE/11/2024/81
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)Medium (38% - 44%)
Lot NumberAkhand Mn 40-42%
Deviance0
Inward Quantity42.86
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3814.54
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.45
Fe7.54
SiO213.16
Al2O38.15
P0.114
Size 0-10MM13.24
Size 10-20MM18.28
Size 20-100MM60.94
Size +100MM7.54
MOISTURE2.32