Supply Date07 Oct 2024
Contract NumberSAFAL/P/MANGANESE ORE/09/2024/72
ItemManganese Ore
Supplier NameAKHAND RESOURCES LIMITED
Grade (%)High (44% - 50%)
Lot NumberAkhand Mn 48-50%
Deviance0
Inward Quantity52.88
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost5975.44
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.26
Fe2.20
SiO211.54
Al2O34.35
P0.088
Size 0-10MM5.89
Size 10-20MM15.76
Size 20-100MM57.81
Size +100MM20.54
MOISTURE1.28