Supply Date31 May 2024
Contract NumberSAFAL/P/MANGANESE ORE/05/2024/47
ItemManganese Ore
Supplier NameJONATHAN NGANDWE
Grade (%)Medium (38% - 44%)
Lot NumberJONATHAN NGANDWE KAWAMBWA MATERIAL FY 2024
Deviance0
Inward Quantity42.1
Freight28.0497
Loading Charges0
Offloading Charges0
Royalty5.19568
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3016.25
Conversion Rate (Please insert 1 if no conversion is required)26.7383
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
P0.239
Al2O36.62
SiO28.74
Fe2.94
Mn40.09
Size 0-10MM12.66
Size 10-20MM13.92
Size 20-100MM59.73
Size +100MM13.69
MOISTURE1.62