Supply Date31 May 2024
Contract NumberSAFAL/P/MANGANESE ORE/05/2024/41
ItemManganese Ore
Supplier NameJUDITH BWALYA
Grade (%)Medium (38% - 44%)
Lot NumberJUDITH BBWALYA MN ORE MEDIUM GRADE FY 2024
Deviance0
Inward Quantity26.28
Freight14.5858188
Loading Charges0
Offloading Charges0
Royalty3.78114
Other Cost-9.34969558599
Quality Deviance0
Grade Deviance0
Total Cost1590.11
Conversion Rate (Please insert 1 if no conversion is required)26.7383
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn34.2
Fe22.07
SiO28.52
Al2O38.34
P0.252
Size 0-10MM4.81
Size 10-20MM6.32
Size 20-100MM55.70
Size +100MM30.97
MOISTURE2.20