Supply Date30 May 2024
Contract NumberSAFAL/P/MANGANESE ORE/05/2024/52
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDINGCHENG MEDIUM GRADE MN ORE-FY 2024
Deviance0
Inward Quantity49.32
Freight17.66034276
Loading Charges20
Offloading Charges0
Royalty4.69
Other Cost1.104704708
Quality Deviance0
Grade Deviance0
Total Cost6631.32
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.63
Fe2.51
SiO26.48
Al2O33.02
P0.118
Size 0-10MM6.12
Size 10-20MM10.91
Size 20-100MM60.24
Size +100MM22.73
MOISTURE1.87