Supply Date20 May 2024
Contract NumberSAFAL/P/MANGANESE ORE/05/2024/47
ItemManganese Ore
Supplier NameJONATHAN NGANDWE
Grade (%)Medium (38% - 44%)
Lot NumberJONATHAN NGANDWE KAWAMBWA MATERIAL FY 2024
Deviance0
Inward Quantity45.14
Freight31.211
Loading Charges0
Offloading Charges0
Royalty4.99076
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3440.37
Conversion Rate (Please insert 1 if no conversion is required)25.632
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.47
Fe3.46
SiO212.35
Al2O37.21
P0.182
Size 0-10MM8.12
Size 10-20MM15.24
Size 20-100MM60.52
Size +100MM16.12
MOISTURE2.23