Supply Date31 Oct 2019
Contract NumberOS/MN ORE/72/2019
ItemManganese Ore
Supplier NameJoshua Chikonde
Grade (%)Medium (38% - 44%)
Lot NumberJoshua Chikonde 41-43 %
Deviance0
Inward Quantity135.623
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost10504.46
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn44.25
Fe3.79
SiO27.51
Al2O35.88
P0.15
Size 0-10MM10-100mm
Size 10-20MM-
Size 20-100MM-
Size +100MM-