Supply Date20 Dec 2023
Contract NumberSAFAL/P/MANGANESE ORE/12/2023/52
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberDINGCHENG (CHIKONDE/SAKENI) HIGH GRADE FY 2023
Deviance
Inward Quantity42.12
Freight25
Loading Charges30
Offloading Charges0.007735894
Royalty2.619811
Other Cost1.451090866
Quality Deviance0
Grade Deviance0
Total Cost5478.91
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.39
Fe2.71
SiO210.01
Al2O33.52
P0.116
Size 0-10MM17.02
Size 10-20MM11.29
Size 20-100MM49.09
Size +100MM19.99
MOISTURE1.82