Supply Date20 Jul 2023
Contract NumberSAFAL/P/MANGANESE ORE/06/2023/19
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDINCHENG MN ORE FY 2023
Deviance0
Inward Quantity17.66
Freight0
Loading Charges0
Offloading Charges0
Royalty4.19
Other Cost0.00453001132
Quality Deviance0
Grade Deviance0
Total Cost1416.24
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.47
Fe3.75
SiO216.05
Al2O36.95
P0.162
Size 0-10MM11.48
Size 10-20MM15.62
Size 20-100MM70.80
Size +100MM2.10
MOISTURE3.70