Raw Material Inward
| Supply Date | 08 Jul 2023 |
|---|---|
| Contract Number | SAFAL/P/MANGANESE ORE/05/2023/1 |
| Item | Manganese Ore |
| Supplier Name | Gamcore Zambia Limited |
| Grade (%) | High (44% - 50%) |
| Lot Number | Gamcore Mn ore FY 23 |
| Deviance | 0 |
| Inward Quantity | 33.12 |
| Freight | 24.6845858475 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 6.219 |
| Other Cost | 5 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 4037.45 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |