Supply Date09 Jul 2023
Contract NumberSAFAL/P/MANGANESE ORE/05/2023/1
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDINCHENG MN ORE FY 2023
Deviance0
Inward Quantity18.64
Freight0
Loading Charges0.00858369098
Offloading Charges0
Royalty4.1
Other Cost0.3
Quality Deviance0
Grade Deviance0
Total Cost1498.82
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.04
Fe3.70
SiO216.30
Al2O34.78
P0.166
Size 0-10MM5.22
Size 10-20MM8.35
Size 20-100MM84.33
Size +100MM2.10
MOISTURE4.75