Supply Date08 Jul 2023
Contract NumberSAFAL/P/MANGANESE ORE/05/2023/1
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDINCHENG MN ORE FY 2023
Deviance0
Inward Quantity30.76
Freight12.0689655172
Loading Charges0.19
Offloading Charges-0.00325097529
Royalty4.118
Other Cost0.00032509752
Quality Deviance0
Grade Deviance0
Total Cost2841.43
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.11
Fe3.60
SiO216.05
Al2O34.90
P0.164
Size 0-10MM5.18
Size 10-20MM5.90
Size 20-100MM83.22
Size +100MM5.70
MOISTURE3.25