Supply Date05 Jul 2023
Contract NumberSAFAL/P/MANGANESE ORE/04/2023/12
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mathews Mn ore FY 23
Deviance0
Inward Quantity36.76
Freight25.6264236902
Loading Charges2.091
Offloading Charges0
Royalty6.229
Other Cost0.00081610446
Quality Deviance0
Grade Deviance0
Total Cost4225.46
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.1
Fe3.39
SiO29.5
Al2O33.96
P0.11
Size 0-10MM3.9
Size 10-20MM10.1
Size 20-100MM29.6
Size +100MM56.4
MOISTURE0.5