Supply Date20 Jun 2023
Contract NumberSAFAL/P/MANGANESE ORE/04/2023/12
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mathews Mn ore FY 23
Deviance0
Inward Quantity37.7
Freight23.0414746543
Loading Charges1.83353909716
Offloading Charges0
Royalty6.182
Other Cost-0.00026525198
Quality Deviance0
Grade Deviance0
Total Cost4224.54
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.05
Fe6.02
SiO28.94
Al2O34.90
P0.139
Size 0-10MM1.52
Size 10-20MM1.05
Size 20-100MM61.73
Size +100MM35.70
MOISTURE0.60