Supply Date18 May 2023
Contract NumberSAFAL/P/MANGANESE ORE/05/2023/1
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAmizo Power Mn ore FY 23
Deviance0
Inward Quantity42.44
Freight22.6171243941
Loading Charges10
Offloading Charges0
Royalty0
Other Cost1.26114246879
Quality Deviance0
Grade Deviance0
Total Cost5512.03
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.25
Fe3.42
SiO212.75
Al2O34.05
P0.122
Size 0-10MM3.20
Size 10-20MM3.05
Size 20-100MM39.65
Size +100MM54.10
MOISTURE1.25