Supply Date13 May 2023
Contract NumberSAFAL/P/MANGANESE ORE/05/2023/1
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAmizo Power Mn ore FY 23
Deviance0
Inward Quantity38.54
Freight22.4598930481
Loading Charges10
Offloading Charges0
Royalty0
Other Cost1.28170190565
Quality Deviance0
Grade Deviance0
Total Cost5000.24
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.02
Fe3.59
SiO29.18
Al2O33.35
P0.116
Size 0-10MM1.85
Size 10-20MM1.80
Size 20-100MM41.85
Size +100MM54.50
MOISTURE0.80