Supply Date13 May 2023
Contract NumberSAFAL/P/MANGANESE ORE/05/2023/1
ItemManganese Ore
Supplier NameGamcore Zambia Limited
Grade (%)High (44% - 50%)
Lot NumberGamcore Mn ore FY 23
Deviance0
Inward Quantity41.16
Freight23.0650948231
Loading Charges0
Offloading Charges0
Royalty5.141
Other Cost-25.0004859086
Quality Deviance0
Grade Deviance0
Total Cost3671.7
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.92
Fe3.75
SiO215.37
Al2O35.98
P0.134
Size 0-10MM5.38
Size 10-20MM5.10
Size 20-100MM70.92
Size +100MM18.60
MOISTURE1.85