Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.53/2023
ItemManganese Ore
Supplier NameJIANFEL WU
Grade (%)Medium (38% - 44%)
Lot NumberOS 2023 WUYANG INVESTMENT -JIANFEI WU MN ORE
Deviance0
Inward Quantity29.2
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4940.35
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.59
Fe5.78
SiO213.10
Al2O316.52
P0.165
Size 0-10MM19.65
Size 10-20MM30.78
Size 20-100MM25.10
Size +100MM24.47
MOISTURE5.45