Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.51/2023
ItemManganese Ore
Supplier NameTai Zam Wood
Grade (%)Medium (38% - 44%)
Lot NumberOS 2023 TAI ZAM WOOD MN ORE
Deviance0
Inward Quantity22.915
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost844.65
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.39
Fe3.45
SiO215.78
Al2O34.78
P0.170
Size 0-10MM6.25
Size 10-20MM3.90
Size 20-100MM85.75
Size +100MM4.10
MOISTURE3.95