Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.49/2023
ItemManganese Ore
Supplier NameSIMON CHOMBA
Grade (%)Medium (38% - 44%)
Lot NumberOS 2023 SIMON CHOMBA MN ORE
Deviance0
Inward Quantity98.24
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost12006.89
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.22
Fe3.38
SiO215.90
Al2O34.90
P0.172
Size 0-10MM7.35
Size 10-20MM5.35
Size 20-100MM84.90
Size +100MM2.40
MOISTURE4.20