Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.44/2023
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberOS 2023 KAMPOKO MINE MG LUMPY 2
Deviance0
Inward Quantity114.111
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1635.21
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.10
Fe2.90
SiO217.95
Al2O33.10
P0.142
Size 0-10MM0.40
Size 10-20MM0.52
Size 20-100MM59.50
Size +100MM83.13
MOISTURE1.48