Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.43/2023
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberOS 2023 KAMPOKO MINE (36-38%)2
Deviance0
Inward Quantity82.189
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost4361.77
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.78
Fe4.75
SiO211.75
Al2O36.05
P0.174
Size 0-10MM1.35
Size 10-20MM0.45
Size 20-100MM18.32
Size +100MM79.88
MOISTURE0.95