Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.38/2023
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberOS 2023 DING CHENG INVESTMENT LTD MN ORE
Deviance0
Inward Quantity914.377
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost80520.04
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.20
Fe2.25
SiO216.10
Al2O32.38
P0.137
Size 0-10MM0.65
Size 10-20MM0.72
Size 20-100MM17.10
Size +100MM81.53
MOISTURE1.20