Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.37/2023
ItemManganese Ore
Supplier NameChisabi Bosco Kipelembe
Grade (%)Medium (38% - 44%)
Lot NumberOS 2023 CHISABI BOSCO MG MN ORE
Deviance0
Inward Quantity91.992
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost8326.2
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.02
Fe2.26
SiO216.00
Al2O32.89
P0.140
Size 0-10MM0.54
Size 10-20MM0.29
Size 20-100MM14.75
Size +100MM84.56
MOISTURE0.58