Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.24/2023
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)High (44% - 50%)
Lot NumberOS 2023 GENESIS PROCUREMENT HG
Deviance0
Inward Quantity172.06
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost19096.94
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.10
Fe3.50
SiO210.66
Al2O33.50
P0.110
Size 0-10MM2.60
Size 10-20MM2.10
Size 20-100MM59.70
Size +100MM25.60
MOISTURE2.10