Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.22/2023
ItemManganese Ore
Supplier NameDominic M Katongo
Grade (%)High (44% - 50%)
Lot NumberOS 2023 DOMNIC MULENGA KATONGO MN ORE
Deviance0
Inward Quantity79.02
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost8887.38
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.00
Fe2.04
SiO215.00
Al2O32.7
P0.142
Size 0-10MM0.3
Size 10-20MM0.3
Size 20-100MM15.10
Size +100MM84.30
MOISTURE1.15