Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.18/2023
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberOS 2023 AMIZO POWER MN ORE
Deviance0
Inward Quantity715.75
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost117425.95
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.19
Fe2.78
SiO211.15
Al2O33.45
P0.12
Size 0-10MM0.45
Size 10-20MM0.55
Size 20-100MM14.35
Size +100MM84.65
MOISTURE0.85