Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.11/2023
ItemManganese Ore
Supplier NameLobo Chisenga (Elias Silomba)
Grade (%)Low (32% - 38%)
Lot NumberOS 2023 LOBO CHISENGA (ELIAS SILOMBA)MN ORE
Deviance0
Inward Quantity40.235
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3.22
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.10
Fe3.78
SiO212.82
Al2O34.20
P0.115
Size 0-10MM1.72
Size 10-20MM1.77
Size 20-100MM58.14
Size +100MM38.37
MOISTURE1.62