Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.09/2023
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Low (32% - 38%)
Lot NumberOS 2023 KAMPOKO LG
Deviance0
Inward Quantity49.3
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3505.23
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn34.05
Fe3.77
SiO213.40
Al2O34.28
P0.132
Size 0-10MM4.95
Size 10-20MM3.55
Size 20-100MM75.55
Size +100MM15.95
MOISTURE1.15