Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.06/2023
ItemManganese Ore
Supplier NameGenesis Procurement Ltd
Grade (%)Low (32% - 38%)
Lot NumberOS 2023 GENESIS PROCUREMENT MN ORE
Deviance0
Inward Quantity20.6
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1116.93
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn32.82
Fe16.65
SiO210.11
Al2O37.81
P0.24
Size 0-10MM4.5
Size 10-20MM3.9
Size 20-100MM49.50
Size +100MM50.50
MOISTURE2.81