Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.05/2023
ItemManganese Ore
Supplier NameGAEA MANAGEMENT SERVICES LTD
Grade (%)Low (32% - 38%)
Lot NumberOS 2023 GAEA MANAGEMENT MN ORE
Deviance0
Inward Quantity20.64
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1512.09
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.10
Fe8.2
SiO216.6
Al2O35.62
P0.13
Size 0-10MM11.50
Size 10-20MM9.10
Size 20-100MM67.20
Size +100MM12.20
MOISTURE2.90