Supply Date01 Jan 2023
Contract NumberSAFAL/P/MN ORE/01.03/2023
ItemManganese Ore
Supplier NameDANNY
Grade (%)Low (32% - 38%)
Lot NumberOS 2023 DANNY MN ORE
Deviance0
Inward Quantity21.58
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1523.33
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.10
Fe3.6
SiO219.10
Al2O35.2
P0.124
Size 0-10MM4.9
Size 10-20MM6.1
Size 20-100MM78.50
Size +100MM10.50
MOISTURE1.5