Supply Date01 Jan 2023
Contract NumberSAFAL/P/IRON ORE/01.05/2023
ItemIron Ore
Supplier NameKEMOSE MINING LTD
Grade (%)N/A
Lot NumberOS 2023 KEMOSE MINING LTD IRON ORE
Deviance0
Inward Quantity45.24
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1361.27
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe66.7
Mn1.3
SiO24.2
Al2O33.04
P0.122
Size 0-10MM1.8