Supply Date01 Jan 2023
Contract NumberSAFAL/P/IRON ORE/01.06/2023
ItemIron Ore
Supplier NameMM,KUMWENDA
Grade (%)N/A
Lot NumberOS 2023 MM.KUMWENDA IRON ORE
Deviance0
Inward Quantity35.58
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1322.51
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe67.14
Mn2.1
SiO23.8
Al2O32.25
P0.12
Size 0-10MM2.4