Supply Date01 Jan 2023
Contract NumberSAFAL/P/IRON ORE/01.01/2023
ItemIron Ore
Supplier NameACCELETATED GERMINATION CORPORATION
Grade (%)N/A
Lot NumberOS 2023 ACCDERATED GERMINATION IRON ORE
Deviance0
Inward Quantity455.665
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost17925.86
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Fe66.90
Mn1.2
SiO25.12
Al2O32.67
P0.118
Size 0-10MM7.5