Supply Date29 Dec 2022
Contract NumberSAFAL/P/MN ORE/12.04/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity31.84
Freight29.8315116223
Loading Charges1.67
Offloading Charges0.734610553
Royalty7.032
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4306.94
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.10
Fe2.01
SiO215.10
Al2O33.10
P0.110
Size 0-10MM2.15
Size 10-20MM1.90
Size 20-100MM10.05
Size +100MM85.90
MOISTURE0.85