Supply Date29 Dec 2022
Contract NumberSAFAL/P/MN ORE/12.01/2022
ItemManganese Ore
Supplier NameDANNY
Grade (%)Low (32% - 38%)
Lot NumberDANNY MN ORE
Deviance0
Inward Quantity21.58
Freight17.8989
Loading Charges0
Offloading Charges-12
Royalty3.69
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1523.31
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn34.10
Fe4.99
SiO220.10
Al2O310.60
P0.120
Size 0-10MM10.56
Size 10-20MM15.90
Size 20-100MM14.04
Size +100MM29.50
MOISTURE8.10.